Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik > Daidalos Team discussions

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #31  
Old 03-04-2013, 05:27 AM
SaQSoN SaQSoN is offline
Approved Member
 
Join Date: Oct 2008
Location: Nowhereland
Posts: 340
Default

Quote:
Originally Posted by Liz Lemon View Post
When you say it takes 160-200 man hours for a pit in a 177, what does that mean; Just the 3d model, or the textures as well? Is animation included?
It's modeling, texturing and engine conversion. Animation in IL-2 game is done via Java programing by rotating/moving respective parts around/along preset axles (which were set by a modeler) in a game's 3D world. So, animation is is not modeler's work in this game, so it wasn't included.

Also, it should be noted, that this is not just a simple modeling and painting textures. Since in many cases the references are scarce, some parts are often missing, or damaged on a reference pictures, etc., modeler would have to conduct a lots of research work, while building a model of a historical object. Which requires at least some knowledge of technology and structural design of such RL object.

Last edited by SaQSoN; 03-04-2013 at 05:34 AM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:59 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.