Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 05-16-2012, 04:02 AM
Seadog Seadog is offline
Approved Member
 
Join Date: Jun 2011
Posts: 226
Default

Quote:
Originally Posted by Crumpp View Post
The rest require replacing the heads and in some cases, rings as well as the required modifications to the fuel metering system. This work was performed at Service Inspection intervals. Do you know what that means?
The March 20 1940 memo clearly states that new built aircraft already had the internal engine mods:

http://www.wwiiaircraftperformance.org/ap1590b.jpg

Given the production numbers for Hurricanes/Spitfires and RAF operational and combat losses prior to the start of the BofB, it is extremely doubtful that any unmodded aircraft were still in front line service. Production during March, April, May and June, and July, of 1940 would have amounted to approximately 1500 Hurricane/Spitfire aircraft, or greater then RAF FC's front line strength at the start of the BofB.

The memo clearly establishes that all RAF FC Hurricanes/Spitfires were modded for Hundred octane fuel and 12lb boost prior to the start of the BofB.

Last edited by Seadog; 05-16-2012 at 07:30 AM.
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:00 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.