Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > FMB, Mission & Campaign builder Discussions

Reply
 
Thread Tools Display Modes
  #1  
Old 04-09-2012, 10:19 AM
FG28_Kodiak FG28_Kodiak is offline
Approved Member
 
Join Date: Dec 2009
Location: Swabia->Bavaria->Germany
Posts: 884
Default

At the moment with time amount, but it's no problem doing this via menu. But at the moment there is the problem with the missionmenu for the red side on dediserver, so it's better to wait for the patch, and hope the patch solving this problem.
How many of this Sector Station Ops Room where available at BoB? How many radars and other observers was attached to one station?

Last edited by FG28_Kodiak; 04-09-2012 at 10:23 AM.
Reply With Quote
  #2  
Old 04-09-2012, 10:48 AM
Osprey's Avatar
Osprey Osprey is offline
Approved Member
 
Join Date: Jan 2010
Location: Gloucestershire, England
Posts: 1,264
Default

Quote:
Originally Posted by FG28_Kodiak View Post
At the moment with time amount, but it's no problem doing this via menu. But at the moment there is the problem with the missionmenu for the red side on dediserver, so it's better to wait for the patch, and hope the patch solving this problem.
How many of this Sector Station Ops Room where available at BoB? How many radars and other observers was attached to one station?

DANG! So the custom menu code is not available on dedicated servers? I must admit, I couldn't get it to work but I put it down to me being rubbish. Is there a way you can fire an event to the server to obtain that radar information?

Please view my above post for further context, they are just ideas.
Reply With Quote
  #3  
Old 04-09-2012, 10:57 AM
Osprey's Avatar
Osprey Osprey is offline
Approved Member
 
Join Date: Jan 2010
Location: Gloucestershire, England
Posts: 1,264
Default

About the 4 minutes delay. It appears to be bang on because the RDF data went through a filter station (where people examined the plotted information) before being passed to the FC bunker - this website is definitely worth a read.

http://www.ventnorradar.co.uk/CH.htm

"The edited data was assembled as markers on a large plotting table and this showed the situation as it had been something like four minutes previously : since then the bombers would have flown about another fifteen miles"

This is interesting too. Vector was only confirmed with the second reading.
"Repeated plots became the direction of travel (vector) with the height and estimated number of aircraft repeatedly confirmed"

CH was blind past the coast and then the OC was used. But was the delay resolved for the BoB???
"With the separate raids thus identified, the information was passed to an Operations room staff who could then make the tactical decisions regarding the deployment and vectoring of the defending aircraft, either those already in the air or presently on the ground, towards their ever moving targets. It was found that those best equipped to calculate the required courses were recuperating experienced pilots as they were able to better visulise the everchanging relationships between defending and attacking aircraft. However, once the enemy aircraft had crossed the coast the CH RDF could no longer detect them and then the Royal Observer Corps reports to the Filter Room became the sole means of tracking the enemy."

"The system of having to use correction charts before reporting plots to the Filter Room contributed to the four minute delay and and sometimes of course the human factor introduced errors. This problem was solved by 'The Calculator'. Designed and installed by the Post Office ( which later constructed the Colossi computers for Bletchley Park) and using relays and uniselectors, this little known and uncelebrated early form of computer automatically added the correction factors to the input plots and displayed the results visually as the grid reference. The machine could also correct heights in the same way and a mechanically linked teleprinter could send the data by telephone line to the remote Filter Room. Ventnor was equipped with its first calculator in June 1940 and received its second in April 1941."

Last edited by Osprey; 04-09-2012 at 11:02 AM.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:09 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.