Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 05-02-2012, 05:51 PM
winny winny is offline
Approved Member
 
Join Date: Sep 2009
Location: Manchester UK
Posts: 1,508
Default

Quote:
Originally Posted by Crumpp View Post
Pstyle,

I was refering to fact a military fuel must carry a specification approved by that organization.

It will not become the standard fuel without a full specification. The completion of the specification IS the process of adoption. A provisional specification gets it into the system so it can be tested.

Understand?
And where is your evidience that this was policy? Or the paperwork saying that it had happened, that makes you so sure?

And what is 100 octane doing in the pilot's notes if it wasn't 'specified'?
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:25 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.