Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #20  
Old 04-12-2012, 08:26 PM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Spitfire Mk I Pilots Operating Notes, dated June 1940:



This is an Inspection and Test Certificate for a specific aircraft with a Merlin Mk III engine. Inspection and Test Certificate is probably the same as an FAA Form 337 allowing major modification for research or testing purposes. Note the document clears a single aircraft by serial number on 28 February 1940. The July of 1940 Spitfire Mk II manual clears the Merlin III engine for use of 100 Octane fuel and notes +12lbs may be used.

That is not the Spitfire Mk I but rather the Spitfire Mk II. There is nothing authorizing the Spitfire Mk I to use +12lbs in any of the Operating Notes.


Last edited by Crumpp; 04-12-2012 at 08:46 PM.
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 10:14 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.