Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 10-26-2011, 09:40 AM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Quote:
I havent heard of a single LW report complaining about the manufacturer's specifications being wrong.
It definitely gets fixed if it does occur. Focke Wulf had an issue with one of its subcontractors, Dornier (NDW) not meeting specifications.

It was discovered when the Luftwaffe was rejecting a large number of aircraft. The complaint was excessive vibration and fuel consumption. It generated several reports on the issue and was fixed promptly. It caused NDW to suffer greatly increased oversight and they almost lost their contract.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:30 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.