Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 10-29-2011, 03:42 PM
CaptainDoggles's Avatar
CaptainDoggles CaptainDoggles is offline
Approved Member
 
Join Date: Jun 2011
Posts: 1,198
Default

Quote:
Originally Posted by Robo. View Post
Of course they did, but did they really strain a brand new engine to verify the max speed on the deck? If you have any further information about the tests conducted by RLM / BAL in order to accept an airframe they have paid for? That would be great to know, but using logic again, would their test pilots push the new a/c to its limits? I believe they would not and if the plane performed within limits, they were happy.
It's not "straining" the engine if that's what the engine has been designed to do. The engineers say "you can run at XYZ power settings for 5 minutes." Why would the RLM pay for aircraft they aren't sure can meet the contracted obligations? They must have verified that the aircraft can deliver. It's a simple fact, and continuing to cover your ears and sing LA LA LA LA in face of this fact makes me think you are just another forum troll.


Quote:
No, I never said such thing. I never stated that Mtt failed to deliver what they were legaly bound to. I said they most probably did not perform extensive tests to prove our point. The fact is, no matter what test you look at, no aiframe ever managed to reach the speed in the Mtt chart. That brings you straight back to the beginning of this discussion.
Either they tested enough to ensure the required performance was being achieved or they did not; there is no middle ground. Either the aircraft met the requirements or it didn't. There is no middle ground. You can't say "I'm not saying they didn't deliver what they were required to deliver" in one breath and then say "they didn't do extensive testing" the very next. HOW DID THEY KNOW WHAT THEY WERE DELIVERING IF THEY DIDN'T VERIFY IT WITH TESTING?

And again you're trying to make it sound as if every single test ever conducted on the 109E shows it not meeting proper speeds. Guess what? We don't have the data from every test ever. Stop trying to re-frame the issue based on your agenda.

----

I'm done engaging with you on this subject. You next post is going to be another one saying that the contractual obligations were actually just imaginary, theoretical numbers and blah blah. I don't have the patience to repeat the same facts over and over and have somebody just ignore it and say "but I think it's this way" so I will leave you to it.

Last edited by CaptainDoggles; 10-29-2011 at 03:49 PM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 04:57 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.