Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-17-2012, 01:15 PM
NZtyphoon NZtyphoon is offline
Approved Member
 
Join Date: Feb 2012
Location: NZ
Posts: 543
Default

Quote:
Originally Posted by Crumpp View Post
Let's see this unspecific boost!

The June 1940 Operating Instructions make no mention whatsoever for a higher boost at take off.




It is being read properly. That is backed up by the logs.

Notice the engine is modified during Service Inspection:





LMAO!! It specifics which method of compliance will be used in production. It does not say a single thing about engines produced in the past!!
If you can't read properly that's your problem; the form says absolutely nothing about what type of inspection K9878 is undergoing, and the final sentence says END change to 100 Octane, referring to the fact that the entire unit has gone over to 100 Octane by 16 March 1940, PRE dating AP1590B which is dated 20 March 1940 and confirming what AP1590 says, that Merlin engines were already being modified.
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:15 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.