Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-29-2012, 02:29 AM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Quote:
Emergency +12 lbs./sq. in. Boost Operation: Pilot's Notes, Merlin II, III and IV, 4th Edition, April 1940, page 6.
Which pilot notes?

FYI, The engine manual is not the aircraft installation. Just because an engine is approved does not mean an aircraft is approved. Each installation is unique.

That is why the RAF throughly tested all of the airframes using the Merlin engine when they made the conversion.

The instructions for boost cut out would have been published as part of Phase IV testing. In fact, that is one of the main purposes of Phase IV testing to publish instructions, manuals, and conduct operations.

A good example of that is auto fuel STC's. Just because the engine can run autofuel does not mean an airframe that mounts that engine can use autofuel.
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:37 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.