Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #34  
Old 06-15-2011, 10:35 PM
ICDP ICDP is offline
Approved Member
 
Join Date: Oct 2007
Posts: 157
Default

Quote:
Originally Posted by Seadog View Post
In Nov 1940, the Merlin XX was given "official" approval to use 12lb/3000rpm but strip inspections were not required after its use:

The Merlin 60 series engines were cleared for 15 and 18lb boost for combat and again strip inspections were not required after use:

An oil filter check was recommended, which probably took about 10mins.

The above data is from the Spit 9 Pilot's notes and from a Merlin 60 series maintenance manual.
Meaning that at some stage prior to the Merlin XX was introduced strip inspections were required after overboost was used. Good info, it seems +12lbs boost on the Merlin II, III and XII was limited to a short amount of time... oh I don't know, 5 minutes maybe
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 07:38 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.