Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 06-09-2011, 07:31 PM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Quote:
First off, Dowding's memo states
Who cares? The published Operating Instructions and Technical Orders for the Spitfire are clear. Dowding was not the technical expert on Rolls Royce engines. He had people to fill that role for him and he followed their advice.

It is a fact, ANY use of +12lbs in the Merlin engines requires a log book entry and a mechanics inspection before the engine is returned to service.

You seem to think that having the engine inspected after the extreme stress of over boosting is uncommon.

Almost every fighter aircraft engine in WWII had to have it done.

BMW, Diamler, Rolls Royce, Allison, and just about every else required it. It only makes practical sense.

Even OUR P51D Merlin had the same instructions:



I think you just want a magic win button for your game.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:16 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.