Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik: Cliffs of Dover > Technical threads > FM/DM threads

FM/DM threads Everything about FM/DM in CoD

Closed Thread
 
Thread Tools Display Modes
  #1  
Old 05-06-2012, 05:46 PM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Quote:
How many squadrons do you believe used 100 octane in the BOB, and how do you support it?
Kurfurst would be smart to stay the hell away from that question. It is an opinion at this point and not fact. I was asked the same thing by you and offered my opinion. Go back and read the immature garbage the spouts from certain participants in this thread.

Thing about opinion is everyone has one and in the western world the idea of free speech says we all can have one too.

However when presents an opinion on such a subject as the exact number of squadrons at a specified point in time and backs up with the relevant facts, the personal assaults begin. Why? That is good tactic when your argument is based on emotion, circumstance, and assumption.

Thing about the facts on this point is we don't have all of them to make a pinpoint determination. We can only make general statements.

Quote:
Crumpp says:

The statement "all Fighter Command was using 100 Octane July 1940" is not backed up by the facts.

The statement "100 Octane was used during the Battle of Britain" is correct and backed up by the facts.

It is clear that Fighter Command was in process of adopting the fuel but it is equally clear that process was not complete in July 1940. There is no agreement on the end dates for the Battle of Britain. So, depending on the dates one chooses for the battle to end, the process was or was not completed during the battle itself.
The only document that will give us an approximate time for the completion of the transition is the operating notes. If you find an earlier edition that lists 100 Octane in Operating Notes on the Merlin Engine then you will know within a few weeks when the transition was completed.
  #2  
Old 05-06-2012, 06:11 PM
Crumpp's Avatar
Crumpp Crumpp is offline
Approved Member
 
Join Date: Feb 2008
Posts: 1,552
Default

Quote:
So am I but we don't know what they say. Besides what is wrong with going by when the fuel was issued and used? That at least we do know
Why are you trying to force an answer on this issue without all the facts?

Why do you insist that you know all the facts and the only operational document that definately tells us is wrong while you are right?

We happen to be lucky enough that the Operating Notes is a legal document published by the Air Ministry and will reflect how the type was operated.

Quote:
The majority of the work was already being incorporeated in new engines and in regular maintanence
The regular squadron maintenance personnel did not handle this and that is why the order specifies Service Inspection. RAF squadron did not perform that inspection. RAF squadron personnel performed daily and routine maintenance. The CRO performed major alterations.

In NEW engines but the RAF already had ~700 Hurricanes and Spitfires in the inventory during the time the instructions came out. Consider that meant some ~1400 to 2100 engines in maintenance stocks that also had to be modified.

The new production also has to cover maintenance stocks, too.
  #3  
Old 05-06-2012, 06:27 PM
Glider Glider is offline
Approved Member
 
Join Date: Jun 2011
Posts: 441
Default

Quote:
Originally Posted by Crumpp View Post
Why are you trying to force an answer on this issue without all the facts?

Why do you insist that you know all the facts and the only operational document that definately tells us is wrong while you are right?

We happen to be lucky enough that the Operating Notes is a legal document published by the Air Ministry and will reflect how the type was operated.



The regular squadron maintenance personnel did not handle this and that is why the order specifies Service Inspection. RAF squadron did not perform that inspection. RAF squadron personnel performed daily and routine maintenance. The CRO performed major alterations.

In NEW engines but the RAF already had ~700 Hurricanes and Spitfires in the inventory during the time the instructions came out. Consider that meant some ~1400 to 2100 engines in maintenance stocks that also had to be modified.

The new production also has to cover maintenance stocks, too.
We don't know when the changes were first installed on new engines, we do know that the changes were already in place so a number of the 700 would already have them. We also know that the engines in service would have already gone through service inspection, so that would account for a number more.
In the three months following the issue of the paper a high proportion of the engines would be serviced or in the case of Hurricanes, newer arcraft would have replaced the ones in the squadrons in March.

I personally consider combat reports and station/squadron records as official documents, you may not but I do on that we will have to differ
  #4  
Old 05-06-2012, 06:19 PM
Glider Glider is offline
Approved Member
 
Join Date: Jun 2011
Posts: 441
Default

Quote:
Originally Posted by Crumpp View Post
Kurfurst would be smart to stay the hell away from that question. It is an opinion at this point and not fact. I was asked the same thing by you and offered my opinion. Go back and read the immature garbage the spouts from certain participants in this thread.

Thing about opinion is everyone has one and in the western world the idea of free speech says we all can have one too.

However when presents an opinion on such a subject as the exact number of squadrons at a specified point in time and backs up with the relevant facts, the personal assaults begin. Why? That is good tactic when your argument is based on emotion, circumstance, and assumption.

Thing about the facts on this point is we don't have all of them to make a pinpoint determination. We can only make general statements.



The only document that will give us an approximate time for the completion of the transition is the operating notes. If you find an earlier edition that lists 100 Octane in Operating Notes on the Merlin Engine then you will know within a few weeks when the transition was completed.
You would be hard pressed to find an insult from me on this thread despite being on the receiving end of a number of barbs from others including you.

The operating notes are useless for what you intend, what counts is when it was issued and used.

Can I take it that you have dropped the 16 squadron theory?

Personally I am happy to leave the situation as being that FC was effectively equipped with 100 Octane during the BOB. I cannot prove that every station was equipped, I do believe it but know that I cannot prove it without a huge amount of time.

Last edited by Glider; 05-06-2012 at 08:21 PM.
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:02 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.