Fulqrum Publishing Home   |   Register   |   Today Posts   |   Members   |   UserCP   |   Calendar   |   Search   |   FAQ

Go Back   Official Fulqrum Publishing forum > Fulqrum Publishing > IL-2 Sturmovik > Daidalos Team discussions

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 01-27-2012, 07:41 PM
AndyJWest AndyJWest is offline
Approved Member
 
Join Date: Jan 2010
Posts: 1,049
Default

If we can't send money to Team Daidalos, that doesn't necessarily mean we can't help pay for new content. The Pe-8 was an external effort, sponsored to some considerable extent by contributions, which paid for professional 3D modelling. This is a little problematic of course, in that putting funds up in the early stages is risky, and it does require a lot of trust. And then, we'd have to agree on what was to be modelled. Obviously, TD would have to be involved to some extent too - not least in ensuring that the project conformed to official limits etc. I'd like to hear how TD feel about this though - was the Pe-8 project a good precedent?
__________________
MoBo: Asus Sabertooth X58. CPU: Intel i7 950 Quad Core 3.06Ghz overclocked to 3.80Ghz. RAM: 12 GB Corsair DDR3 (1600).
GPU: XFX 6970 2GB. PSU: 1000W Corsair. SSD: 128 GB. HDD:1 TB SATA 2.
OS: Win 7 Home Premium 64bit. Case: Antec Three Hundred. Monitor: 24" Samsung.
Head tracking: TrackIR 5. Sore neck: See previous.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:20 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 2007 Fulqrum Publishing. All rights reserved.