View Single Post
  #2  
Old 04-30-2012, 09:46 PM
Robo.'s Avatar
Robo. Robo. is offline
Approved Member
 
Join Date: Sep 2009
Location: Nottingham, UK
Posts: 658
Default

Quote:
Originally Posted by robtek View Post
Btw, the Luftwaffe did change a 109 engine in the field in 15 minutes, the RAF took a day, iirc.
RAF took 2 days and LW 30 seconds. In the snow. Uphill.
__________________
Bobika.
Reply With Quote