View Single Post
  #356  
Old 01-30-2012, 03:01 PM
bongodriver's Avatar
bongodriver bongodriver is offline
Approved Member
 
Join Date: Mar 2011
Location: United Kingdom
Posts: 2,546
Default

Quote:
Originally Posted by adonys View Post
I've just doublechecked with one of our professional modelers, taking the RATA/109 as our subjects, and we've reached the following conclusions (assuming you have all the documentation already gathered and available, which usually is the job of the designers):
- 1 week for the external frame (modelling & unwrapping)
- 3 weeks for the internal cockpit (modelling & unwrapping)
- 4 weeks for texturing (1 for external frame, 3 for internal cockpit)
- additional 4 weeks for tweaking, etc

That's a timeframe of around 2-3 months per model, with a single man working. Working with two men (one modeler, one texture artist) will cut this time frame in half (of course, the texture artist will have to wait for the first model to be ready, before starting the cycle)

...
so assuming they have 1 person per plane (maybe they have 2 planes per person?)

2-3 months for the basic textured model....animations too?

how many more months for the FM, DM etc and the tweaking time for them?

then add the research time to that (it should be included)
__________________


Intel Q9550 @3.3ghz(OC), Asus rampage extreme MOBO, Nvidia GTX470 1.2Gb Vram, 8Gb DDR3 Ram, Win 7 64bit ultimate edition